Saturday, October 26, 2019

so i'm through 41 of the 70 html files. there's one more for the 3rd, and one for the 19th, but the remaining 27 run from the 27th to the 29th. so, i can put that aside for a bit.

i've already mostly cleaned up the actual music production part. that's why it took so long to build the master. and, there are dozens of uploads through mid-november, too, from 1996-2000.

the next thing is to rearrange the email communication i had with sennheiser over the 3rd-8th, roughly, which is actually the bulk of the document, because i just copied over all the forwards and stuff. i initially arranged this in the form of a conversation by condensing a dozen emails into a single exchange, but i'm going to replace this with the same kind of emails i had previously produced, as i've moved to a more detailed format.

that might take a bit, but it should be pretty fast after that.